World Environment Day at ONGC Videsh

World Environment Day at ONGC Videsh World Environment Day was celebrated at ONGC Videsh under the aegis of United Nations Environment Programme on the theme ‘Connecting people to nature’, which implores to get outdoor into nature, to appreciate its beauty and its significance and to take forward the call to protect the Earth. Employees and families of […]

Greater Nile Petroleum Operating Co. Ltd. celebrates World Environment Day

Greater Nile Petroleum Operating Co. Ltd. celebrates World Environment Day GNPOC, being prudent operator, always remain in pursuit to take care of nature and do all possible efforts to protect the Earth. On occasion of World Environment Day 2017 tree plantation was carried out in Khartoum office and in field connecting with the theme ‘Connecting People […]

World Environment day, 2017


Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /var/www/html/ongcvidesh/wp-includes/formatting.php on line 3500
World Environment day, 2017  World Environment day, 2017  विश्व पर्यावरण दिवस, 2017

A lasting partnership – ONGC Videsh and PDVSA

PdVSA executives from Venezuela, who have now successfully completed their M.Tech Program at Indian Institute of Technology (Indian School of Mines) Dhanbad were recently felicitated by Mr PK Rao, Director (Operations) in the presence of Venezuelan Ambassador, His Excellency Sr. Augosto Montiel, Regional President of Venezuela Business Unit, Mr Sukant Tiwari, Head of the Petroleum […]

विश्व पर्यावरण दिवस 2017 | World Environment Day 2017


Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /var/www/html/ongcvidesh/wp-includes/formatting.php on line 3500
विश्व पर्यावरण दिवस 2017 | World Environment Day 2017  विश्व पर्यावरण दिवस परिपत्र  WED 2017 Circular

Director (Operations) infuses fresh energy in San Cristobal Project, Venezuela

Project San Cristobal, El –Tigre, Venezuela got a fresh infusion of energy when Mr. P. K. Rao, Director (Operations), recently visited the San Cristobal Project. There has been continuous decline in the production from the project due to decline in the reservoir pressure. Detailed reservoir studies had been carried out by the joint venture with […]

अनुवाद पैनल से संबन्धित कार्यालय आदेश


Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /var/www/html/ongcvidesh/wp-includes/formatting.php on line 3500
अनुवाद पैनल से संबन्धित कार्यालय आदेश  अनुवाद पैनल से संबन्धित कार्यालय आदेश